Failure to make your site accessible on the date of delivery can delay your barn's delivery. Please be sure to carefully adhere to our site access requirements
Site Requirements
To prepare your site for delivery, please read the following carefully:
Please be sure your site is accessible on the day of delivery. Failure to do so can result in a delay in the delivery of your barn.
Your driveway or fence opening needs to be 12' for 10' buildings and 14' for 12' buildings. However, the overhead clearance needs to be 14' for 10' and 12' buildings, assuming that the access is straight ahead. If the access is around corners, trees, shrubs, etc., the clearances need to be increased accordingly.
We need a 50' to 60' minimum drive-away area from the end of the shed after it comes off the end of the trailer. This should be as level as possible from pad site to ground level.
Our delivery equipment is 4-wheel drive and we are able to traverse most terrain without incident.